First Delivery
Today they delivered the floor joists and the osb decking. I also watched the guy dump a whole bundle of the osb. You can see the concrete blanket on the driveway. Since the spec house to the south does not have one, I am assuming (and hoping) they are still planning on pouring the dirveway soon.
No comments:
Post a Comment