Tuesday, December 21, 2010

Busy Subcontractors

With the framers finished, the HVAC and the Electrical is really coming along.  The electrician has another day left, and the HVAC is another day or to from being finished also.  The shingles are almost done too, with about a half day left and I am really happy with the color we picked out.  The plumber is scheduled to come tomorrow, and the Supervisor is hoping to get it all inspected by the end of the week.  It also looks like they poured the front porch today, and the sidewalk from the driveway to the porch should be soon to follow. 
 wires, wires, everywhere
 Fireplace is installed





No comments:

Post a Comment